Every Northern Territory scheme, with status and date verified
One Northern Territory scheme is listed on the government pages we read on 27 October 2026: none open, one closed and none with a status of waitlist or not stated. Each Northern Territory row links to the page the status was read from, and the last column is the date it was read.
| Scheme | Type | Status | Amount | Who it is for | Verified |
|---|---|---|---|---|---|
| Home and Business Battery Scheme (HBBS) | Rebate | closed | Was $400 per kWh of usable battery capacity up to a maximum grant of $12,000 | owner-occupiers and businesses | 27 October 2026 |
Home and Business Battery Scheme (HBBS): closed. Closed to new grants after reaching its $6 million allocation (announced 10 June 2025); was open to NT homeowners, businesses and not-for-profit or community organisations via GrantsNT vouchers. No 2026 round found.
The federal STC discount in Northern Territory
The default STC zone for the Northern Territory is Zone 2, the zone of Darwin, with a rating of 1.536. For Darwin the certificates are kW x 1.536 x 5 years, rounded down, and we value each at $39. Every Northern Territory postcode in the note we hold sits in Zone 2, so the table applies across the territory.
| System | Certificates (5-year deeming, 2026 install) | Value at $39 | From 1 January 2027 (4-year deeming) |
|---|---|---|---|
| 5 kW | 38 | $1,482 | 30 certificates, $1,170 |
| 6.6 kW | 50 | $1,950 | 40 certificates, $1,560 |
| 10 kW | 76 | $2,964 | 61 certificates, $2,379 |
| 13 kW | 99 | $3,861 | 79 certificates, $3,081 |
Row by row for Darwin: a 5 kW system earns 38 certificates, worth $1,482. A 6.6 kW system earns 50 certificates, worth $1,950. A 10 kW system earns 76 certificates, worth $2,964. A 13 kW system earns 99 certificates, worth $3,861.
The deeming period for a Northern Territory install drops from 5 years to 4 on 1 January 2027, so the same 6.6 kW system in Darwin earns 40 certificates ($1,560) instead of 50, a cut of $390. A Darwin system installed and connected before the end of 2026 keeps the 5-year count.
Compare the 50 certificates and $1,950 above with the STC line on your Darwin quote; if it is 10 per cent or more below ours, ask where the gap went. Our $39 for Darwin sits under the spot price of $39.90 reported for 19 to 23 October 2026 and the $40 clearing house cap, so an installer has no market reason to credit much less. Check any quote against the index at the quote check.
The federal battery discount (Cheaper Home Batteries Program) in Northern Territory
The federal Cheaper Home Batteries Program is open in the Northern Territory and pays 6.8 STCs per usable kWh for a battery installed between 1 May 2026 and 31 December 2026: the full factor on the first 14 kWh, 60 per cent of it on each kWh from 14 to 28 kWh, 15 per cent from 28 to 50 kWh and nothing above 50 kWh. For a Northern Territory household at $39 per STC that is about $265 per kWh up to 14 kWh; the CER describes it as around a 30 per cent discount on the upfront cost.
| Usable capacity | Eligible kWh | Certificates | Discount |
|---|---|---|---|
| 10 kWh | 10 kWh | 68 | $2,652 |
| 14 kWh | 14 kWh | 95 | $3,705 |
| 20 kWh | 17.6 kWh | 119 | $4,641 |
The 14 kWh step is the cliff for Northern Territory buyers: 14 kWh earns 95 certificates ($3,705), and 20 kWh earns 119 ($4,641) because only 60 per cent of the 6 kWh above 14 counts, so the extra 6 kWh adds $936 of discount. Price the extra capacity against that.
From 1 January 2027 the factor falls to 5.7 STCs per kWh for a Northern Territory install, and it steps down again every six months after that.
| Usable capacity | Eligible kWh | Certificates | Discount |
|---|---|---|---|
| 10 kWh | 10 kWh | 57 | $2,223 |
| 14 kWh | 14 kWh | 79 | $3,081 |
| 20 kWh | 17.6 kWh | 100 | $3,900 |
In the Northern Territory the federal conditions are the national ones: one battery per premises, new and on the CEC approved list, between 5 and 100 kWh nominal with certificates on the first 50 kWh usable, installed by an SAA-accredited installer with battery endorsement, on a VPP-capable inverter if grid connected, with no income test and no property value cap. Compare installed battery prices for Darwin on the solar with battery cost page.
Nothing from the Northern Territory government stacks on top of the federal discount on 27 October 2026: the Home and Business Battery Scheme (HBBS) is closed.
The battery side on its own, with every Northern Territory battery scheme open or closed, the cost after the rebate and the payback, is on the Northern Territory battery rebate page.
What a 6.6 kW system costs in Darwin after the rebates
The Darwin figures are Solar Choice installer offers for October 2026, interpolated between the published 6 kW and 7 kW sizes, not quotes received by homeowners. The $1,950 STC discount for Zone 2 is already inside both Darwin numbers.
| Offer | After STC | STC already deducted | Northern Territory panel rebate | After state rebate |
|---|---|---|---|---|
| Standard offer | $10,250 | $1,950 | None for panels | $10,250 |
| Premium offer | $12,260 | $1,950 | None for panels | $12,260 |
No Northern Territory rebate applies to panels, so $10,250 to $12,260 is the range to hold a Darwin quote against.
Sizes from 3 kW to 20 kW are on the Darwin solar cost page, and the national picture is on the solar panels cost page.
How to claim
- Take the STC discount on the quote. In Zone 2 a 6.6 kW system in Darwin earns 50 certificates, worth $1,950 at $39 each. In the Northern Territory you assign the certificates to the installer, who takes that value off the price, so the quote should show the certificate count and the price per STC rather than one bundled discount.
- Skip the state step in the Northern Territory. The Home and Business Battery Scheme (HBBS) is closed: closed to new grants after reaching its $6 million allocation (announced 10 June 2025). No open Northern Territory application exists, so nothing is lost by going straight to the federal discounts.
- Add the federal battery discount if you are buying storage. For a Northern Territory home it is one battery per premises, new and on the CEC approved list, installed by an SAA-accredited installer with battery endorsement on a VPP-capable inverter; there is no income test and no property value cap, and the installer applies it upfront by taking the STCs, 68 of them on 10 kWh ($2,652).
- Hold the quote against the Darwin index. After the rebates a 6.6 kW system should land between $10,250 and $12,260; run yours through the quote check and compare every state scheme on the rebates by state page.
Northern Territory solar rebate questions
Is there a Northern Territory government rebate on solar panels in 2026?
No. The Northern Territory had no open scheme on 27 October 2026: the Home and Business Battery Scheme (HBBS) is closed. The federal STC discount of $1,950 on 6.6 kW in Darwin is the whole subsidy on panels.
How much is the STC discount on a 6.6 kW system in Darwin?
$1,950 in Darwin: 50 certificates from 6.6 kW x 1.536 (Zone 2) x 5 years, rounded down, at $39 per STC. A 10 kW system earns 76 certificates, worth $2,964. From 1 January 2027 the deeming period is 4 years and 6.6 kW in Darwin earns 40 certificates, worth $1,560.
How much is the federal battery discount in the Northern Territory?
$2,652 on a 10 kWh battery, $3,705 on 14 kWh and $4,641 on 20 kWh at $39 per STC for a Northern Territory install before 31 December 2026. From 1 January 2027 a Northern Territory install gets 5.7 STCs per kWh, so the same batteries earn $2,223, $3,081 and $3,900.
What does a 6.6 kW system cost in Darwin after the rebates?
$10,250 to $12,260: the Solar Choice standard and premium installer offers for Darwin in October 2026 are $10,250 and $12,260 after the $1,950 STC discount, and no Northern Territory rebate applies to panels.
What changes on 1 January 2027 for a Northern Territory install?
Four years of STC deeming instead of five, which takes 6.6 kW in Darwin from $1,950 to $1,560, and a battery factor of 5.7 STCs per kWh instead of 6.8, which takes 10 kWh from $2,652 to $2,223. A system installed and connected in 2026 keeps the 2026 figures.
Is the Home and Business Battery Scheme (HBBS) still open in the Northern Territory?
Closed as at 27 October 2026. Closed to new grants after reaching its $6 million allocation (announced 10 June 2025); was open to NT homeowners, businesses and not-for-profit or community organisations via GrantsNT vouchers.
What changed for Northern Territory solar and battery rebates in 2025?
One Northern Territory scheme closed or was suspended in 2025. The Home and Business Battery Scheme (HBBS): closed to new grants after reaching its $6 million allocation (announced 10 June 2025). The federal STC discount and the Cheaper Home Batteries Program continue.